New Order for a Strip Removal System at a Trimming Shear in Neuss
Neuss, January 2013
Schuh Anlagentechnik received the order to deliver a strip removal system for the plant in Neuss of Georg Maschinenfabrik GmbH at the beginning of this year.
The strip removal system allows the continuous extraction and conveying of the aluminium strips. Each strip is collected directly at the trimming shear and transported separately to the winder afterwards. The transport air is cleaned via a wet separator.
The delivery of the strip removal system is planned for September 2013.
At the end of the year, marketable material will be produced with the aid of the strip removal system for the first time.